• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRUNNION REPLACEMENT
TRUNNION REPLACEMENT - Continued

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  620    621    622    623    624  625  626    627    628    629    630  
img
.
TM 5-2410-241-23-2
0130
REMOVAL
000130
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure
to follow this warning may cause injury or death to personnel.
N OT E
Procedure will remove one trun ion. Follow the same procedure for other trunnion.
n
Trunnion weighs approximately 60 lb (27 kg).
1. With assistance, remove 16 bolts (Figure 1, Item 3), washers (Figure 1, Item 2), and trunnion (Figure 1, Item 4)
from track roller frame (Figure 1, Item 1).
2. Place trunnion on flat level surface.
Figure 1. Trunnion.
0130
END OF TASK
CLEANING AND INSPECTION
000130
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0130-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.