TRACK LINK REPLACEMENT - Continued
Figure 1. Trunnion.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  619    620    621    622    623  624  625    626    627    628    629  
img
.
4
TM 5-2410-241-23-2
0130
FIELD MAINTENANCE
-
TRUNNION REPLACEMENT
0130
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Blade removed (WP 0268)
0
(WP 0302, Item 65)
Machine parked (TM 5-2410-241-10)
0
0
Materials/Parts
Drawing Required
0
0
Rag, Wiping (WP 0303, Item 24)
TM 5-2410-241-24P, Figure 132
0
0
Personnel Required
Estimated Time to Complete
0
0
2.5 Hr
Two
0
0
References
0
WP 0295
0
0130-1