TRANSMISSION INTERMEDIATE SPEED SENSOR ONE REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  736    737    738    739    740  741  742    743    744    745    746  
img
. . . .
TM 5-2410-241-23-2
0142
INSTALLATION CONTINUED
28. Install two brackets (Figure 20, Item 6), four washers (Figure 20, Item 4), and bolts (Figure 20, Item 5) on
machine.
29. Install guard (Figure 20, Item 1), four washers (Figure 20, Item 3), and bolts (Figure 20, Item 2) on transmission
case (Figure 20, Item 7).
Figure 20. Plate.
0142
END OF TASK
FOLLOW-ON TASKS
000142
1. Install rear bottom guard (WP 0199).
2. Fill transmission and bevel gear case with oil (WP 0151).
3. Install axles (WP 0116).
4. With winch - install winch (WP 0272).
5. Install ripper control valve (WP 0213).
6. With ripper - install ripper frame (WP 0279).
7. Install main drive shaft (WP 0117).
8. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE