• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY REPLACEMENT - Continued
Figure 7. Battery Box.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  826    827    828    829    830  831  832    833    834    835    836  
img
.
TM 5-2410-241-23-2
0155
INSTALLATION CONTINUED
N OT E
Install cables as tagged during removal.
5. Install battery power cable (Figure 6, Item 4) on batteries (Figure 6, Item 10).
6. Install two crossover cables (Figure 6, Items 5 and 11) on batteries (Figure 6, Item 10).
7. Install six clamps (Figure 6, Item 1) and tighten nuts (Figure 6, Item 3) on batteries (Figure 6, Item 10).
8. Position six covers (Figure 6, Item 2) on clamps (Figure 6, Item 1).
9. Install battery ground cable (Figure 6, Item 9) on batteries (Figure 6, Item 10).
10. Install two clamps (Figure 6, Item 7) and tighten nuts (Figure 6, Item 6) on batteries (Figure 6, Item 10).
11. Position two covers (Figure 6, Item 8) on clamps (Figure 6, Item 7).
Figure 6. Batteries.
0155
0155-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.