TM 5-2410-241-23-2
0169
INSTALLATION
000169
N OT E
Install electrical connections and harness routing as noted during removal.
1. Install harness (Figure 2, Item 6) and connect two connectors (Figure 2, Item 1) on machine.
2. Install new tiedown straps (Figure 2, Item 2) on harness (Figure 2, Item 6).
3. Connect connector (Figure 2, Item 5) on connector (Figure 2, Item 3).
4. Install new tiedown wire (Figure 2, Item 4) on connector (Figure 2, Item 5).
5. Install guard (Figure 3, Item 1), four washers (Figure 3, Item 3), and bolts (Figure 3, Item 2) on machine.
Figure 3. Guard.
0169
END OF TASK
FOLLOW-ON TASKS
000169
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE