Figure 2. Transmission Harness.
FUEL TANK HARNESS ASSEMBLY REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  945    946    947    948    949  950  951    952    953    954    955  
img
.
TM 5-2410-241-23-2
0169
INSTALLATION
000169
N OT E
Install electrical connections and harness routing as noted during removal.
1. Install harness (Figure 2, Item 6) and connect two connectors (Figure 2, Item 1) on machine.
2. Install new tiedown straps (Figure 2, Item 2) on harness (Figure 2, Item 6).
3. Connect connector (Figure 2, Item 5) on connector (Figure 2, Item 3).
4. Install new tiedown wire (Figure 2, Item 4) on connector (Figure 2, Item 5).
5. Install guard (Figure 3, Item 1), four washers (Figure 3, Item 3), and bolts (Figure 3, Item 2) on machine.
Figure 3. Guard.
0169
END OF TASK
FOLLOW-ON TASKS
000169
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0169-3/(4 blank)