• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Clamps at Filler Tube.
Figure 9. Implement Pump to Hydraulic Tank.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1157    1158    1159    1160    1161  1162  1163    1164    1165    1166    1167  
img
.
TM 5-2410-241-23-2
0191
INSTALLATION CONTINUED
5. Install clamp (Figure 7, Item 3), hose (Figure 7, Item 4), washer (Figure 7, Item 1), and bolt (Figure 7, Item 2)
on machine.
Figure 7. Clamp.
0191
6. Install two new O-rings (Figure 8, Items 2 and 3) on elbow (Figure 8, Item 1).
Figure 8. Elbow.
0191
0191-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.