• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 19. Doors.
FRONT BOTTOM GUARD REMOVAL

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  35    36    37    38    39  40  41    42    43    44    45  
img
. . . . . . . . . . . . . . .
10
TM 5-2410-241-23-3
0199
FIELD MAINTENANCE INSTRUCTIONS
-
BOTTOM GUARDS REPLACEMENT
0199
Front Bottom Guard Removal, Middle Bottom Guards Removal, Rear Bottom Guard Removal, Cleaning
and Inspection, Rear Bottom Guard Installation, Middle Bottom Guards Installation, Front Bottom Guard
Installation
INITIAL SETUP
Tools and Special Tools - Continued
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Wrench, Electric Impact,
(WP 0302, Item 65)
3/4" Square Drive, 1,200 lb-ft
0
(S0730) (WP 0302, Item 68)
Handle, Ratchet, 1/2" Drive, 10" Long
0
Lifting Device (200-lb capacity)
(S0563)(WP 0302, Item 68)
0
0
Jack Stands (2) consisting of:
Wood Blocks
0
0
Pin, Shoulder, Headless, Jack Stand
Materials/Parts
0
(WP 0302, Item 42)
0
Rag, Wiping (WP 0303, Item 24)
Repair Tool, Special Purpose (Tube),
0
Cotter pin (3)
Jack Stand(WP 0302, Item 49)
0
0
Saddle Assembly, Lifting Block,
Personnel Required
0
Jack Stand
Two
(WP 0302, Item 50)
0
0
References
Stand Assembly, Jack Stand
0
(WP 0302, Item 56)
0
WP 0295
0
Socket, 1/2" Drive, 6 Point, 1-1/8" (S0582)
Equipment Condition
(WP 0302, Item 68)
0
0
Socket, Impact, 3/4" Drive, 6 Point,
Machine parked (TM 5-2410-241-10)
0
30 mm (S0688) (WP 0302, Item 68)
0
Drawing Required
Socket, Impact, 3/4" Drive, 6 Point,
0
TM 5-2410-241-24P, Figure 92
1 1/8" (S0972) (WP 0302, Item 68)
0
0
Wrench, Box, 12 Point, 30 mm and
Estimated Time to Complete
0
32 mm (S0772) (WP 0302, Item 68)
0
1.5 Hr
0
0199-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.