• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Switch Panel Harness.
Figure 11. Switch Pod Connectors.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  165    166    167    168    169  170  171    172    173    174    175  
img
.
TM 5-2410-241-23-3
0208
UPPER RIGHT ACCESS PANEL INSTALLATION CONTINUED
6. Push switch panel harness (Figure 10, Item 1) through upper right access panel (Figure 10, Item 7) and install
grommet (Figure 10, Item 2).
N OT E
Ensure harness is not trapped between panels.
7. Position upper right access panel (Figure 10, Item 7) to installed location.
8. Install washer (Figure 10, Item 6), nut (Figure 10, Item 5), horn button (Figure 10, Item 4), and screw
(Figure 10, Item 3) on horn switch.
Figure 10. Pod Harness.
0208
0208-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.