TM 5-2410-241-23-3
0208
UPPER RIGHT ACCESS PANEL INSTALLATION CONTINUED
6. Push switch panel harness (Figure 10, Item 1) through upper right access panel (Figure 10, Item 7) and install
grommet (Figure 10, Item 2).
N OT E
Ensure harness is not trapped between panels.
7. Position upper right access panel (Figure 10, Item 7) to installed location.
8. Install washer (Figure 10, Item 6), nut (Figure 10, Item 5), horn button (Figure 10, Item 4), and screw
(Figure 10, Item 3) on horn switch.
Figure 10. Pod Harness.
0208