• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Right-hand Pillar Liner.
Figure 15. Right-hand Pillar Liner.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  409    410    411    412    413  414  415    416    417    418    419  
img
. .
TM 5-2410-241-23-3
0229
LEFT-HAND PILLAR LINER REMOVAL
000229
Remove bolt (Figure 14, Item 1), coat-hook (Figure 14, Item 2), and left-hand pillar liner (Figure 14, Item 3) from
machine. Discard left-hand pillar liner.
Figure 14. Left-hand Pillar Liner.
0229
END OF TASK
CLEANING AND INSPECTION
000229
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
LEFT-HAND PILLAR LINER INSTALLATION
000229
Position left-hand pillar liner (Figure 14, Item 3) on machine and install coat-hook (Figure 14, Item 2) and bolt
(Figure 14, Item 1).
END OF TASK
0229-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.