• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. Left-hand Pillar Liner.
Figure 17. Cab Lamp Assembly.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  410    411    412    413    414  415  416    417    418    419    420  
img
.
TM 5-2410-241-23-3
0229
RIGHT-HAND PILLAR LINER INSTALLATION
000229
Install new right-hand pillar liner (Figure 15, Item 1) and install on machine.
Figure 15. Right-hand Pillar Liner.
0229
END OF TASK
CAB LAMP INSTALLATION
000229
1. Install three speed nuts (Figure 16, Item 4) on headliner (Figure 16, Item 3).
2. Install cab lamp assembly (Figure 16, Item 2) and three screws (Figure 16, Item 1) on headliner (Figure 16,
Item 3).
Figure 16. Cab Lamp Screws.
0229
0229-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.