• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT FLOOR PLATE REPLACEMENT
Figure 3. Floor Mat.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  420    421    422    423    424  425  426    427    428    429    430  
img
. .
TM 5-2410-241-23-3
0230
REMOVAL CONTINUED
2. Remove four bolts (Figure 2, Item 3), washers (Figure 2, Item 4), and two supports (Figure 2, Item 2) from floor
plate (Figure 2, Item 1).
3. Remove ten bolts (Figure 2, Item 8), washers (Figure 2, Item 9), and floor plate (Figure 2, Item 1) from platform
(Figure 2, Item 10).
4. Remove eight bolts (Figure 2, Item 6), washers (Figure 2, Item 7), and floor plate (Figure 2, Item 5) from
platform (Figure 2, Item 10).
Figure 2. Front Floor Plates.
0230
END OF TASK
CLEANING AND INSPECTION
000230
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0230-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.