• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Front Floor Plates.
REAR FLOOR PLATE REPLACEMENT

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  421    422    423    424    425  426  427    428    429    430    431  
img
.
TM 5-2410-241-23-3
0230
INSTALLATION
000230
1. Install floor plate (Figure 2, Item 5), eight washers (Figure 2, Item 7), and bolts (Figure 2, Item 6) on platform
(Figure 2, Item 10).
2. Install floor plate (Figure 2, Item 1), ten washers (Figure 2, Item 9), and bolts (Figure 2, Item 8) on platform
(Figure 2, Item 10).
3. Install two supports (Figure 2, Item 2), four washers (Figure 2, Item 4), and bolts (Figure 2, Item 3) on floor
plate (Figure 2, Item 1).
4. Install floor mat (Figure 3, Item 1) on floor plate (Figure 3, Item 2).
Figure 3. Floor Mat.
0230
END OF TASK
FOLLOW-ON TASKS
000230
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0230-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.