• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Floor Mat.
Figure 2. Rear Floor Plate.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  422    423    424    425    426  427  428    429    430    431    432  
img
. . . . . . .
4
TM 5-2410-241-23-3
0231
FIELD MAINTENANCE INSTRUCTIONS
-
REAR FLOOR PLATE REPLACEMENT
0231
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Machine parked (TM 5-2410-241-10)
0
Tool Kit, General Mechanic's
(WP 0302, Item 65)
0
Seat suspension removed (WP 0248)
0
Materials/Parts
Drawing Required
0
0
Rag, Wiping (WP 0303, Item 24)
0
TM 5-2410-241-24P, Figure 126
0
References
Estimated Time to Complete
0
0
2.5 Hr
WP 0295
0
0
REMOVAL
000231
1. Release buckle on tiedown strap (Figure 1, Item 1).
2. Remove floor mat (Figure 1, Item 2) from machine.
Figure 1. Floor Mat.
0231
0231-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.