10
TM 5-2410-241-23-3
FIELD MAINTENANCE INSTRUCTIONS
-
WINDOW REPLACEMENT
0246
Front Window Removal, Rear Window Removal, Right Side Windows Removal,
Left Side Windows Removal, Cleaning and Inspection, Left Side Windows Installation,
Right Side Windows Installation, Rear Window Installation, Front Window Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
0
Tool Kit, General Mechanic's
0
0
Gloves, Rubber (S0208)
Equipment Condition
0
0
Machine parked (TM 5-2410-241-10)
0
Goggles (S0209)
Drawing Required
0
0
Materials/Parts
0
0
Detergent, General Purpose, Liquid
Estimated Time to Complete
0
0
2.0 Hr
0
0
Personnel Required
0
Two
0
0246-1