INSTALLATION
000261
N OT E
Coat new O-rings with clean refrigerant oil before installation.
Install hoses as tagged during removal.
1. Install new O-ring (Figure 1, Item 5) on compressor (Figure 1, Item 1).
2. Install air conditioning pressure switch (Figure 1, Item 4) on compressor (Figure 1, Item 1).
3. Position harness (Figure 1, Item 2) on compressor (Figure 1, Item 1).
4. Connect harness connector (Figure 1, Item 3) on air conditioning pressure switch (Figure 1, Item 4).
END OF TASK
FOLLOW-ON TASKS
000261
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE