• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR CONDITIONING PRESSURE SWITCH REPLACEMENT
AIR CONDITIONING PRESSURE SWITCH REPLACEMENT - Continued

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  705    706    707    708    709  710  711    712    713    714    715  
img
. .
TM 5-2410-241-23-3
0261
REMOVAL
000261
N OT E
Tag hoses to aid installation.
Clean exterior of hoses before removal to prevent contamination.
Cap and plug all hoses and lines to prevent contamination and leaks.
1. Disconnect harness connector (Figure 1, Item 3) from air conditioning pressure switch (Figure 1, Item 4).
2. Position harness (Figure 1, Item 2) aside.
3. Remove air conditioning pressure switch (Figure 1, Item 4) from compressor (Figure 1, Item 1).
4. Remove O-ring (Figure 1, Item 5) from compressor (Figure 1, Item 1). Discard O-ring.
Figure 1. Air Conditioning Pressure Switch.
0261
END OF TASK
CLEANING AND INSPECTION
000261
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0261-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.