• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Instrument Panel Main Harness Connector.
Figure 9. Instrument Panel Main Harness Connector.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  700    701    702    703    704  705  706    707    708    709    710  
img
.
TM 5-2410-241-23-3
0260
INSTALLATION
000260
1. Position instrument panel harness (Figure 7, Item 1) on machine.
2. Install four washers (Figure 7, Item 4) and bolts (Figure 7, Item 3) on connector (Figure 7, Item 2).
Figure 7. Instrument Panel Main Harness Connector.
0260
N OT E
Install harness routing as noted during removal.
Remove tags and install electricalconnections as noted during removal.
Install tiedown straps as noted during removal.
3. Position harness (Figure 8, Item 1) on platform.
4. Connect connector (Figure 8, Item 3) and install bolt (Figure 8, Item 4) on instrument panel harness (Figure 8,
Item 2).
Figure 8. Platform Harness to Instrument Panel Harness Connector.
0260
0260-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.