• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Instrument Panel Main Harness Connector.
Figure 11. Instrument Panel Lights.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  701    702    703    704    705  706  707    708    709    710    711  
img
.
TM 5-2410-241-23-3
0260
INSTALLATION CONTINUED
5. Connect connector (Figure 9, Item 1) on connector (Figure 9, Item 3).
6. Install new tiedown strap (Figure 9, Item 2) on connector (Figure 9, Item 3).
Figure 9. Instrument Panel Main Harness Connector.
0260
N OT E
Install harness routing as noted during removal.
Install electrical connection as noted during removal.
7. Connect connector (Figure 10, Item 8) on connector (Figure 10, Item 7).
8. Install new tiedown strap (Figure 10, Item 6) on connector (Figure 10, Item 7).
9. Connect connector (Figure 10, Item 4) on connector (Figure 10, Item 5).
10. Connect connector (Figure 10, Item 3) on connector (Figure 10, Item 2).
11. Install new tiedown strap (Figure 10, Item 1) to connector (Figure 10, Item 2).
Figure 10. Platform Harness to Instrument Panel Harness Connector.
0260
0260-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.