Figure 11. Instrument Panel Lights.
AIR CONDITIONING PRESSURE SWITCH REPLACEMENT

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  703    704    705    706    707  708  709    710    711    712    713  
img
. .
TM 5-2410-241-23-3
0260
INSTALLATION CONTINUED
N OT E
Install electrical connectors as tagged during removal.
14. Connect four plugs (Figure 12, Items 2, 5, 6 and 12) on instrument panel (Figure 12, Item 11).
15. Connect eight electrical connectors (Figure 12, Items 3, 4, 7, 8, 9, 10, 13 and 15) on instrument panel
(Figure 12, Item 11).
16. Install new tiedown straps (Figure 12, Item 14) to secure wiring harness (Figure 12, Item 1) on instrument
panel (Figure 12, Item 11).
Figure 12. Back of Instrument Panel.
0260
END OF TASK
FOLLOW-ON TASKS
000260
1. Verify correct operation of machine (TM 5-2410-241-10).
2. Install platform (WP 0206).
END OF TASK
END OF WORK PACKAGE
0260-10