• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Charging Hook-Up.
Figure 1. Cover.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  737    738    739    740    741  742  743    744    745    746    747  
img
. . . . . . . . .
6
TM 5-2410-241-23-3
0264
FIELD MAINTENANCE
-
YOKE REPLACEMENT
0264
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
LO 5-2410-241-13
0
(WP 0302, Item 65)
WP 0205
0
0
Bolt, Eye (WP 0302, Item 13)
WP 0295
0
0
Bracket, Link (3/4 in.; 9,000 lb [4,000 kg])
Equipment Condition
(WP 0302, Item 11)
0
0
Machine parked (TM 5-2410-241-10)
Lifting Device (500-lb capacity)
0
0
Lift cylinder removed (WP 0266)
Materials/Parts
0
0
Drawing Required
Rag, Wiping (WP 0303, Item 24)
0
0
TM 5-2410-241-24P, Figure 129
Bolt 1-3/16" (2)
0
0
Gasket
Estimated Time to Complete
0
0
Lip Seal
3.5 Hr
0
0
0264-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.