• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Pin and Yoke.
LIFT CYLINDER HOSES REPLACEMENT

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  742    743    744    745    746  747  748    749    750    751    752  
img
. .
TM 5-2410-241-23-3
0264
INSTALLATION CONTINUED
5. Remove lifting device from bracket links (Figure 6, Item 7).
6. Remove two bolts (Figure 6, Item 6) and bracket links (Figure 6, Item 7) from yoke (Figure 6, Item 8).
7. Install new gasket (Figure 6, Item 4), cover (Figure 6, Item 3), four washers (Figure 6, Item 2), and bolts
(Figure 6, Item 1) on radiator guard (Figure 6, Item 5).
Figure 6. Cover.
0264
END OF TASK
FOLLOW-ON TASKS
000264
1. Install lift cylinder (WP 0266).
2. Apply grease to yoke at grease fitting (LO 5-2410-241-13).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0264-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.