• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Upper Hose Connection Cover.
Figure 3. Tube.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  755    756    757    758    759  760  761    762    763    764    765  
img
.
TM 5-2410-241-23-3
0266
REMOVAL CONTINUED
4. Remove four bolts (Figure 2, Item 10), washers (Figure 2, Item 9) and bracket (Figure 2, Item 2), and
disconnect hose (Figure 2, Item 1) from lift cylinder tube (Figure 2, Item 12).
5. Remove two flanges (Figure 2, Item 7) and O-ring (Figure 2, Item 8) from hose (Figure 2, Item 1). Discard O-
ring.
6. Disconnect hose (Figure 2, Item 3) from elbow (Figure 2, Item 4).
7. Remove elbow (Figure 2, Item 4) from lift cylinder (Figure 2, Item 11).
8. Remove and discard two O-rings (Figure 2, Items 5 and 6) from elbow (Figure 2, Item 4).
Figure 2. Upper Hose Connection.
0266
0266-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.