• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 20. Retaining Clamps.
Figure 22. Support Stabilizer Bar.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  795    796    797    798    799  800  801    802    803    804    805  
img
.
TM 5-2410-241-23-3
0268
INSTALLATION CONTINUED
5. Fully extend lift cylinders (Figure 21, Item 6).
6. Install half-yoke (Figure 21, Item 3), shim pack (Figure 21, Item 2), four bolts (Figure 21, Item 4), and nuts
(Figure 21, Item 1) on blade assembly (Figure 21, Item 5). Repeat for other side.
Figure 21. Lift Cylinder Yoke.
0268
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure to
follow this warning may cause injury or death to personnel.
N OT E
Stabilizer bar weighs 207 lb (94 kg).
0268-22


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.