• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALLATION
Figure 7. Cable Clamps.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  926    927    928    929    930  931  932    933    934    935    936  
img
.
TM 5-2410-241-23-3
0288
INSTALLATION CONTINUED
N OT E
Install cables as noted during removal.
6. Position negative arctic kit battery cable (Figure 6, Item 9) on battery (Figure 6, Item 8).
7. Install negative arctic kit battery cable (Figure 6, Item 9), clamp (Figure 6, Item 2), and tighten nut (Figure 6,
Item 3) on battery (Figure 6, Item 8).
8. Position cable cover (Figure 6, Item 1) over clamp (Figure 6, Item 2).
9. Position positive arctic kit battery cable (Figure 6, Item 7) on battery (Figure 6, Item 8).
10. Install positive arctic kit battery cable (Figure 6, Item 7), clamp (Figure 6, Item 5), and tighten nut (Figure 6,
Item 6) on battery (Figure 6, Item 8).
11. Position cable cover (Figure 6, Item 4) over clamp (Figure 6, Item 5).
Figure 6. Positive and Negative Arctic Kit Battery Cables.
0288
0288-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.