• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARATION FOR HIGHWAY AND RAIL TRANSPORT
PREPARATION FOR MARINE TRANSPORT

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1002    1003    1004    1005    1006  1007  1008    1009    1010    1011    1012  
img
. .
TM 5-2410-241-23-3
0297
PREPARATION FOR HIGHWAY AND RAIL TRANSPORT CONTINUED
Figure 1. Tiedown Locations.
0297
16. Remove ROPS (WP 0225).
17. Stow ROPS and tie down IAW FM 55-30, Army Motor Transport Unit and Operations.
18. Remove cab. Refer to Cab Removal in this work package.
END OF TASK
0297-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.