TM 5-2410-240-23-1
0022
Table 1. Window Wiper and Washer Troubleshooting Procedures - Continued.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
3. Left Door Wiper Does
Not Operate Properly
continuity (WP 0283) between
pump harness (WP 0153, WP 0154).
Continued
harness connector WP-C5 (WP
Ensure all harness connectors are
0018, Figure 234) terminal 1 and
reconnected. Verify proper operation
harness connector WP-C1 (WP
of machine (TM 5-2410-240-10).
0018, Figure 4) terminal 3.
Continuity - Proceed to step 10.
continuity (WP 0283) between
pump harness (WP 0153, WP 0154).
harness connector WP-C5 (WP
Ensure all harness connectors are
0018, Figure 234) terminal 2 and
reconnected. Verify proper operation
harness connector WP-C1 (WP
of machine (TM 5-2410-240-10).
0018, Figure 4) terminal 2.
Continuity - Proceed to step 11.
11. Disconnect harness connector
harness connector PL-C18 (WP
continuity (WP 0283) between
ness (WP 0153, WP 0154). Ensure all
harness connector CH-C26 (WP
harness connectors are reconnected.
0018, Figure 97) terminal 3 and
Verify proper operation of machine
harness connector CH-C1 (WP
(TM 5-2410-240-10).
0018, Figure 81) terminal 34.
Continuity - Proceed to step 13.
continuity (WP 0283) between
ness (WP 0153, WP 0154). Ensure all
harness connector CH-C26 (WP
harness connectors are reconnected.
0018, Figure 97) terminal 2 and
Verify proper operation of machine
harness connector CH-C1 (WP
(TM 5-2410-240-10).
0018, Figure 81) terminal 33.
Continuity - Proceed to step 14.
14. Disconnect harness connector
from harness connector C-C12
continuity (WP 0283) between
harness (WP 0150, WP 0155).
harness connector PL-C18 (WP
Ensure all harness connectors are
0018, Figure 226) terminal 34 and
reconnected. Verify proper operation
harness connector PL-C1 (WP
of machine (TM 5-2410-240-10).
0018, Figure 214) terminal 30.
Continuity - Proceed to step 16.
continuity (WP 0283) between
harness (WP 0150, WP 0155).
harness connector PL-C18 (WP
Ensure all harness connectors are
0018, Figure 226) terminal 33 and
reconnected. Verify proper operation
cab ground.
of machine (TM 5-2410-240-10).
Continuity - Proceed to step 17.
0022-35