• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  978    979    980    981    982  983  984    985    986    987    988  
img
. . . . . .
TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
0358-05 Implement Pilot
4. Using digital multimeter (WP
Resistance Less Than 5.0 Ohms -
Pressure Supply Current
0283), measure resistance
Proceed to Test Step 4.
Below Normal - Continued
between PL-C5 terminal 2 (WP
Resistance 5.0 Ohms or Greater -
0018, Figure 218) and PL-C18
Replace platform wiring harness: with
terminal 20 (WP 0018, Figure
Ripper (WP 0150); with Winch (WP
226).
0155).
Connect chassis wiring harness con-
nector CH-C17 on implement pilot
pressure supply solenoid: with Ripper
(WP 0018, Figure 90) or with Winch
(WP 0018, Figure 261).
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 5.
5. Using MSD (WP 0016), select
Code 0358-05 Active - Repeat trou-
machine control D6K ECM and
bleshooting code from the beginning.
verify 0358-05 is not active.
Code 0358-05 Not Active - Trouble-
shooting complete.
0023-21


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.