TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
0497-06 Blade Tilt Right
Code 0497-06 Active - Repeat trou-
machine control D6K ECM and
bleshooting code from the beginning.
Normal - Continued
verify 0497-06 is not active.
Code 0497-06 Not Active - Trouble-
shooting complete.
Test Step 3. Test M928-BU Blade
to Other Circuits in Platform Wiring
Harness.
1. Turn ignition switch and battery
disconnect switch to OFF position
(TM 5-2410-240-10).
2. Disconnect platform wiring har-
Figure 217) from ECM J1: with
Ripper (WP 0147); with Winch
(WP 0149).
3. Disconnect platform wiring har-
Figure 218) from ECM J2: with
Ripper (WP 0147); with Winch
(WP 0149).
4. Disconnect platform wiring har-
Figure 215) from equipment ECM
(WP 0148).
No Continuity on Any Test Points -
Proceed to step 7.
PL-C4 terminal 61 and all other
Points - Replace platform wiring har-
ure 217).
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Connect chassis wiring harness con-
nector CH-C20 on blade tilt right sole-
264).
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 9.
0023-37