TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
1933-05 Blade Angle Left
Test Step 4. Test K952-BR Blade
Solenoid Current Below Nor- Angle Left Return Circuit for High
mal - Continued
Resistance or Open in Platform
Wiring Harness.
0283), measure resistance
Replace equipment ECM (WP 0148).
between PL-C2 terminal 51 (WP
Connect platform wiring harness con-
0018, Figure 215) and PL-C18
on ECM J2: with Ripper (WP 0147);
226).
with Winch (WP 0149).
Connect platform wiring harness con-
on ECM J1: with Ripper (WP 0147);
with Winch (WP 0149).
Connect platform wiring harness con-
on chassis wiring harness connector
Ripper (WP 0150); with Winch (WP
0155).
Connect chassis wiring harness con-
nector CH-C23 on blade angle left
267).
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 2.
Replace platform wiring harness: with
Ripper (WP 0150); with Winch (WP
0155).
Connect chassis wiring harness con-
nector CH-C23 on blade angle left
267).
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 2.
0023-141