TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
2211-06 Auxiliary Valve #1
Test Step 3. Test J914-PU Ripper
Above Normal - Continued
Other Circuits in Platform Wiring
Harness.
1. Turn ignition switch and battery
disconnect switch to the OFF
position (TM 5-2410-240-10).
2. Disconnect platform wiring har-
Figure 215) from equipment ECM
(WP 0148).
3. Disconnect platform wiring har-
Figure 218) from ECM J2: with
Ripper (WP 0147); with Winch
(WP 0149).
4. Disconnect platform wiring har-
Figure 217) from ECM J1: with
Ripper (WP 0147); with Winch
(WP 0149).
No Continuity on Any Test Points -
Proceed to step 6.
PL-C2 terminal 42 and all other
Points - Replace platform wiring har-
ure 215).
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Connect chassis wiring harness con-
nector CH-C3 on auxiliary valve #1
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 9.
0023-183