TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
2211-05 Auxiliary Valve #1
0283), measure resistance
Proceed to Test Step 4.
Below Normal - Continued
between PL-C2 terminal 42 (WP
0018, Figure 215) and PL-C18
Replace platform wiring harness: with
Ripper (WP 0150); with Winch (WP
226).
0155).
Connect chassis wiring harness con-
nector CH-C3 on auxiliary valve #1
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 5.
Code 2211-05 Active - Repeat trou-
machine control D6K ECM and
bleshooting code from the beginning.
verify 2211-05 is not active.
Code 2211-05 Not Active - Trouble-
shooting complete.
0023-179