• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1131    1132    1133    1134    1135  1136  1137    1138    1139    1140    1141  
img
. . . . . .
TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
3187-04 Auxiliary Valve #1
5. Using digital multimeter (WP
No Continuity on Any Test Points -
Port B Solenoid Voltage
0283), test for continuity between
Proceed to step 6.
Below Normal - Continued
PL-C2 terminal 43 (WP 0018, Fig-
Continuity on One or More Test
ure 215) and all circuits in PL-C5
Points - Replace platform wiring har-
(WP 0018, Figure 218).
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Connect chassis wiring harness con-
nector CH-C3 on auxiliary valve #1
port B solenoid (WP 0018, Figure 83).
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 8.
6. Using digital multimeter (WP
No Continuity on Any Test Points -
0283), test for continuity between
Proceed to step 7.
PL-C2 terminal 43 (WP 0018, Fig-
Continuity on One or More Test
ure 215) and all circuits in PL-C4
Points - Replace platform wiring har-
(WP 0018, Figure 217).
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Connect chassis wiring harness con-
nector CH-C3 on auxiliary valve #1
port B solenoid (WP 0018, Figure 83).
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 8.
0023-174


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.