• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1127    1128    1129    1130    1131  1132  1133    1134    1135    1136    1137  
img
. . . . . . .
TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
2211-03 Auxiliary Valve #1
2. Using digital multimeter (WP
Voltage Greater Than 0.3 Volts -
Port B Solenoid Voltage
0283), measure for voltage
Replace platform wiring harness: with
Above Normal - Continued
between PL-C2 terminal 42 (WP
Ripper (WP 0150); with Winch (WP
0018, Figure 215) and ground.
0155).
Proceed to step 3.
Voltage 0.3 Volts or Less - Replace
equipment ECM (WP 0148).
Connect platform wiring harness con-
nector PL-C5 (WP 0018, Figure 218)
on ECM J2: with Ripper (WP 0147);
with Winch (WP 0149).
Connect platform wiring harness con-
nector PL-C4 (WP 0018, Figure 217)
on ECM J1: with Ripper (WP 0147);
with Winch (WP 0149).
Connect platform wiring harness con-
nector PL-C18 (WP 0018, Figure 226)
on chassis wiring harness connector
CH-C1 (WP 0018, Figure 81): with
Ripper (WP 0150); with Winch (WP
0155).
Proceed to step 3.
3. Using MSD (WP 0016), select
Code 2211-03 Active - Repeat trou-
machine control D6K ECM and
bleshooting code from the beginning.
verify 2211-03 is not active.
Code 2211-03 Not Active - Trouble-
shooting complete.
0023-170


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.