TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
3188-04 Auxiliary Valve #1
No Continuity on Any Test Points -
0283), test for continuity between
Proceed to step 6.
Below Normal - Continued
ure 215) and all circuits in PL-C5
Points - Replace platform wiring har-
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Connect chassis wiring harness con-
nector CH-C2 on auxiliary valve #1
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 8.
No Continuity on Any Test Points -
0283), test for continuity between
Proceed to step 7.
ure 215) and all circuits in PL-C4
Points - Replace platform wiring har-
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Connect chassis wiring harness con-
nector CH-C2 on auxiliary valve #1
For D6K Dozr with Ripper, install rear
plates on machine (WP 0196). For
D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 8.
0023-193