• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PRIME PUMP FLOW TEST
Figure 3. Solenoid Testing.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1254    1255    1256    1257    1258  1259  1260    1261    1262    1263    1264  
img
. .
TM 5-2410-240-23-1
0026
FUEL RAIL PUMP SOLENOID TEST
00026
1. Turn key switch to OFF position (TM 5-2410-240-10).
2. Connect MSD to machine (WP 0016).
3. Turn battery disconnect switch to ON (TM 5-2410-240-10).
4. Turn key switch to ON position. Start ET.
N OT E
Wait at least 30 seconds for diagnostic codes to become active.
5. Monitor active diagnostic codes with ET. Check and record any active diagnostic codes.
6. Select Diagnostics menu (Figure 2, Item 1), Diagnostic Tests (Figure 2, Item 2), and Fuel Rail Pump Solenoid
Test (Figure 2, Item 3).
Figure 2. Fuel Rail Pump Solenoid Menu.
0026
0026-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.