TM 5-2410-240-23-1
0029
ETHER INJECTION SOLENOID OVERRIDE TEST CONTINUED
7. Select On (Figure 3, Item 3) from Change Parameter Value window (Figure 3, Item 1) and select OK button
(Figure 3, Item 2). Ether system will activate for 10 seconds.
Figure 3. Ether Injection Change Window.
0029
END OF TASK
END OF WORK PACKAGE