• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ALTERNATOR AND CHARGING SYSTEM TESTS, INSPECTIONS, AND ADJUSTMENTS
Figure 2. Ammeter Connection.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1297    1298    1299    1300    1301  1302  1303    1304    1305    1306    1307  
img
.
TM 5-2410-240-23-1
0030
CHARGING SYSTEM TEST
00030
N OT E
If battery has a low charge, do not perform first step.
If required, jump start engine or charge battery before engine is started.
1. Turn battery disconnect switch and ignition switch to ON position; do not start the engine.
N OT E
Turn on front and rear work lights, activate headlights using mode switch, activate cab fan,
and turn cab dome light ON (TM 5-2410-240-10) to provide a drain on the batteries.
2. Partially drain batteries for 10 minutes of running cab accessories and lights, with the ignition switch on and
engine shut off.
3. Set dial (Figure 1, Item 6) of ammeter on the 400 DC amp scale (Figure 1, Item 1). Press ZERO button
(Figure 1, Item 2) to zero meter. Make sure that HOLD (Figure 1, Item 3) is not displayed on ammeter screen
(Figure 1, Item 4). If HOLD is displayed, press the HOLD button (Figure 1, Item 5) once.
Figure 1. Ammeter.
0030
0030-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.