• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION STALL TEST
Figure 3. Transmission Stall Test.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1318    1319    1320    1321    1322  1323  1324    1325    1326    1327    1328  
img
.
TM 5-2410-240-23-1
0031
TRANSMISSION STALL TEST CONTINUED
7. Relieve hydraulic system pressure (WP 0147) and install pressure gauge at left side hydrostatic pump
pressure tap (Figure 1, Item 2) and right side hydrostatic pump pressure tap (Figure 1, Item 3) on test panel
(Figure 1, Item 1). Refer to WP 0291 for pressure gauge and hose setup.
Figure 1. Test Panel.
0031
8. Remove cab floor plate (WP 0205), and install pressure gauge at left side hydrostatic pump pressure tap (Fig-
ure 2, Item 2) and right side hydrostatic pump pressure tap (Figure 2, Item 1). Refer to WP 0291 for pressure
gauge and hose setup.
Figure 2. Hydrostatic Pump Pressure Test Port.
0031
0031-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.