• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY CHARGING OUT OF MACHINE
POWERTRAIN TESTS, INSPECTIONS, AND ADJUSTMENTS

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1314    1315    1316    1317    1318  1319  1320    1321    1322    1323    1324  
img
TM 5-2410-240-23-1
0030
BATTERY CHARGING WITH NATO SLAVE RECEPTACLE
00030
1. Perform Battery Test, in this work package, on each battery to ensure all batteries are charged within 0.5-Volt
DC and 200 CCA (Cold Cranking Amps).
2. Turn battery charger switch OFF.
WARN I N G
Turn battery disconnect switch to OFF before installing NATO receptacle. Failure to follow
this warning may result in injury or death to personnel or damage to equipment.
3. Turn battery disconnect switch to OFF.
4. Connect battery cables to batteries (WP 0157).
5. Connect NATO slave jack on battery charger to the NATO slave receptacle.
6. Connect red and black charger cables to battery charger.
N OT E
Ensure battery charger switch is OFF before connecting battery charger power cord.
7. Connect battery charger power cord to battery charger.
8. Turn battery disconnect switch to ON.
9. Turn battery charger switch ON.
10. Charge battery until the green Charge Complete LED is illuminated.
11. Battery charger will terminate when charge current drops below 1 ampere.
12. When charge is complete, turn battery charger switch OFF.
13. Turn battery disconnect switch to OFF.
14. Remove NATO slave jack on battery charger from NATO slave receptacle.
END OF TASK
END OF WORK PACKAGE
0030-19/(20 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.