• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Junction Box to Fuse Panel.
Figure 13. Alternator to Fuse Panel Cable.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1310    1311    1312    1313    1314  1315  1316    1317    1318    1319    1320  
img
.
TM 5-2410-240-23-1
0030
BATTERY AND CABLES INSPECTION CONTINUED
00030
Test Step 2 - Positive Cables - Continued
00030
6. Remove cover (Figure 12, Item 1) from NATO slave receptacle (Figure 12, Item 3).
7. Using digital multimeter, measure voltage between inner contact (Figure 12, Item 2) (positive point) of NATO
slave receptacle (Figure 12, Item 3) and machine ground. Voltage should be less than 1-Volt from value
recorded in step 1.
a. If voltage is more than 1-Volt from value recorded in step 1, replace positive battery cable (Figure 12,
Item 4) (WP 0046) between starter and NATO slave receptacle (Figure 12, Item 3).
b. If voltage is less than 1-Volt from value recorded in step 1, install cover (Figure 12, Item 1) on NATO slave
receptacle (Figure 12, Item 3) and proceed to next step.
Figure 12. Positive Contact of NATO Slave Receptacle.
0030
0030-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.