• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Positive and Negative Battery Voltage Test.
Figure 10. Junction Box to Starter.

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1307    1308    1309    1310    1311  1312  1313    1314    1315    1316    1317  
img
.
TM 5-2410-240-23-1
0030
BATTERY AND CABLES INSPECTION CONTINUED
00030
Test Step 2 - Positive Cables - Continued
00030
2. Remove front floor plate (WP 0209).
3. Using digital multimeter, measure voltage between junction box positive post (Figure 9, Item 1) and machine
ground. Voltage should be less than 1-Volt from value recorded in step 1.
a. If voltage is more than 1-Volt from value recorded in step 1, replace positive battery cable (Figure 9, Item 1)
between battery (Figure 9, Item 3) and junction box (Figure 9, Item 2) (WP 0144).
b. If voltage is less than 1-Volt from value recorded in step 1, proceed to next step.
Figure 9. Battery to Junction Box.
0030
0030-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.