• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 18. Test Panel.
CROSSOVER RELIEF VALVE ADJUST CONTINUED

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1342    1343    1344    1345    1346  1347  1348    1349    1350    1351    1352  
img
.
TM 5-2410-240-23-1
0031
CROSSOVER RELIEF VALVE ADJUST CONTINUED
11. Remove cab floor plate (WP 0202). Install pressure gauge at left side hydrostatic pump pressure tap (Figure
19, Item 2) and right side hydrostatic pump pressure tap (Figure 19, Item 1). Refer to WP 0291 for pressure
gauge and hose setup.
Figure 19. Hydrostatic Pump Pressure Test Port.
0031
0031-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.