• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Engine Harness at Right Side Hydrostatic Pump.
Figure 31. Lower Harness at Right Side Hydrostatic Pump.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
.
TM 5-2410-240-23-2
0046
PUMP HARNESS INSTALLATION CONTINUED
N OT E
Install harness and connect electrical connectors as noted during removal.
11. Connect pump harness (Figure 30, Item 5) on solenoid (Figure 30, Item 4).
12. Connect pump harness (Figure 30, Item 1) on solenoid (Figure 30, Item 2).
13. Install new tiedown strap (Figure 30, Item 3) on pump harness (Figure 30, Item 7) and solenoid (Figure 30,
Item 4).
14. Install new tiedown strap (Figure 30, Item 3) on pump harness (Figure 30, Item 7) and solenoid (Figure 30,
Item 2).
15. Install two new tiedown straps (Figure 30, Item 8) on pump harness (Figure 30, Item 7) and clips (Figure 30,
Item 6).
Figure 30. Pump Harness at Right Side Hydrostatic Pump.
0046
0046-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.