• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Engine Control Wiring Harness and Retaining Hardware.
Figure 8. Engine Control Wiring Harness and Retaining Hardware.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  198    199    200    201    202  203  204    205    206    207    208  
img
TM 5-2410-240-23-2
0052
INSTALLATION CONTINUED
N OT E
Install upper harness as noted during removal.
19. Install upper harness (Figure 8, Item 5) on engine (Figure 8, Item 8).
N OT E
Install electrical connectors as noted during removal.
20. Connect upper harness connector (Figure 8, Item 7) on lower harness connector (Figure 8, Item 9).
21. Connect fuel pressure switch connector (Figure 8, Item 3) on engine (Figure 8, Item 8).
22. Connect liquid level sensor connector (Figure 8, Item 2) on engine (Figure 8, Item 8).
23. Connect fuel temperature sensor connector (Figure 8, Item 4) on engine (Figure 8, Item 8).
24. Connect fuel pressure differential switch connector (Figure 8, Item 1) on engine (Figure 8, Item 8).
N OT E
Install bolts as noted during removal.
25. Install bracket (Figure 8, Item 11) and two bolts (Figure 8, Item 10) on engine (Figure 8, Item 8).
N OT E
Install new tiedown straps as noted during removal.
26. Install nine new tiedown straps (Figure 8, Item 6) securing upper harness (Figure 8, Item 5) on engine
(Figure 8, Item 8).
0052-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.