TM 5-2410-240-23-2
0068
INSTALLATION CONTINUED
12. Install two hose clamps (Figure 12, Item 3), cable bracket (Figure 12, Item 1), washer (Figure 12, Item 4), bolt
(Figure 12, Item 2), washer (Figure 12, Item 6), and nut (Figure 12, Item 7) on standoff bracket (Figure 12,
Item 5).
N OT E
Install electrical connector as noted during removal.
13. Connect wiring harness (Figure 12, Item 8) on machine.
Figure 12. Top of Fuel Prime Pump and Base Assembly.
0068
END OF TASK
FOLLOW-ON TASKS
00068
1. Connect prime pump hose (WP 0069).
2. Install prime pump toggle switch assembly (WP 0071).
3. Install prime pump temperature sensor (WP 0070).
4. Install prime pump fuel toggle switch (WP 0073).
5. Install primary fuel filter assembly (WP 0074).
6. Install right engine access panel (WP 0182).
7. Refill fuel system (TM 5-2410-240-10).
8. Prime fuel system (TM 5-2410-240-10).
9. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE