• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Machine ECM and Harness Retaining Hardware.
Figure 9. Ground Strap and Isolators.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  927    928    929    930    931  932  933    934    935    936    937  
img
.
TM 5-2410-240-23-2
0147
REMOVAL CONTINUED
12. Remove four spacers (Figure 8, Item 1), machine ECM (Figure 8, Item 3), and four isolators (Figure 8, Item 2),
from studs (Figure 8, Item 4).
Figure 8. Spacers, Isolators, and Machine ECM.
0147
END OF TASK
CLEANING AND INSPECTION
000147
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
000147
N OT E
Verify isolators remain seated on machine ECM after installing spacers.
1. Install four isolators (Figure 8, Item 2), machine ECM (Figure 8, Item 3), and spacers (Figure 8, Item 1) on
studs (Figure 8, Item 4).
0147-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.