• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Spacers, Isolators, and Machine ECM.
Figure 11. Harness Grounds.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  928    929    930    931    932  933  934    935    936    937    938  
img
.
TM 5-2410-240-23-2
0147
INSTALLATION CONTINUED
N OT E
Install electrical connectors as noted during removal.
2. Install four isolators (Figure 9, Item 1), washers (Figure 9, Item 4), and ground strap (Figure 9, Item 2) on studs
(Figure 9, Item 3).
Figure 9. Ground Strap and Isolators.
0147
N OT E
Install tiedown straps as noted during removal.
3. Install bracket (Figure 10, Item 1), upper clip (Figure 10, Item 4), and lower clip (Figure 10, Item 5) on studs
(Figure 10, Item 6).
4. Install three new tiedown straps (Figure 10, Item 3) on bracket (Figure 10, Item 1) and harness (Figure 10,
Item 2).
Figure 10. Machine ECM and Harness Retaining Hardware.
0147
0147-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.