• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Harness Grounds.
Figure 13. Platform Harness and Winch Solenoid Harness.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  946    947    948    949    950  951  952    953    954    955    956  
img
.
TM 5-2410-240-23-2
0149
INSTALLATION CONTINUED
7. Install inner bracket (Figure 12, Item 7), outer bracket (Figure 12, Item 8), three washers (Figure 12, Item 2),
and four nuts (Figure 12, Item 1) on studs (Figure 12, Item 9).
N OT E
Install electrical connectors as noted during removal.
8. Connect two harness connectors (Figure 12, Item 6) to machine ECM (Figure 12, Item 5) and tighten screws
(Figure 12, Item 3).
9. Install two caps (Figure 12, Item 4) on nuts (Figure 12, Item 1).
Figure 12. Machine ECM, Harness Connectors, and Retaining Hardware.
0149
0149-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.