• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Ground Strap and Isolators.
Figure 10. Harness Grounds.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  944    945    946    947    948  949  950    951    952    953    954  
img
.
TM 5-2410-240-23-2
0149
INSTALLATION CONTINUED
N OT E
Install tiedown straps as noted during removal.
3. Install bracket (Figure 9, Item 1), upper clip (Figure 9, Item 4), and lower clip (Figure 9, Item 5) on studs
(Figure 9, Item 6).
4. Install three new tiedown straps (Figure 9, Item 3) on bracket (Figure 9, Item 1) and harness (Figure 9, Item 2).
Figure 9. Machine ECM and Harness Retaining Hardware.
0149
0149-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.