• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Platform Harness and Winch Solenoid Harness.
Figure 3. Harness Retaining Hardware.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  939    940    941    942    943  944  945    946    947    948    949  
img
.
TM 5-2410-240-23-2
0149
REMOVAL CONTINUED
N OT E
Tag and mark electrical connectors to aid installation.
5. Remove two caps (Figure 2, Item 4) from nuts (Figure 2, Item 1).
6. Loosen two screws (Figure 2, Item 3) and disconnect harness connectors (Figure 2, Item 6) from machine
ECM (Figure 2, Item 5).
7. Remove four nuts (Figure 2, Item 1), three washers (Figure 2, Item 2), outer bracket (Figure 2, Item 8), and
inner bracket (Figure 2, Item 7) from studs (Figure 2, Item 9).
Figure 2. Machine ECM, Harness Connectors, and Retaining Hardware.
0149
0149-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.